How Custom Rubber Parts Are Made: From Drawing to Delivery

Sourcing custom-molded rubber components can be challenging. You have CAD drawings, strict performance requirements and tight timelines, and you may wonder how your design becomes finished, shippable rubber parts.

Feizhipan Sealing delivers a full end-to-end custom rubber manufacturing service. Below is the complete production process — organized in tables for quick reference — from drawing review and material selection through mold development, sampling, mass production, final QC and export delivery.

01

Drawing Review & Material Selection

We accept 2D PDF / DWG and 3D STEP files. Our engineers perform a DFM (Design for Manufacturability) review to check geometry, tolerances and molding risks, and suggest design optimizations that cut tooling cost and reduce defects.

Rubber MaterialCore PropertiesTypical Applications
EPDMExcellent UV & weather resistanceOutdoor seals, automotive exterior parts
SiliconeWide temperature range, food-grade availableFood equipment, medical accessories, high-temp gaskets
NBR (Nitrile)Great oil & fuel resistanceHydraulic seals, fuel system parts
FKM (Viton®)Superior heat & chemical resistanceHigh-performance industrial sealing
Custom rubber profile with steel insert
Complex custom rubber profiles engineered from customer drawings.
02

Mold Development

Mold quality determines dimensional accuracy, surface finish and batch consistency. Rubber shrinkage is calculated and added into cavity dimensions during mold design.

CNC machined injection mold cavity
Precision CNC machining of multi-cavity molds for mass production.
Mold StageActivitiesNotes
Mold DesignParting line, runner, gate, venting layoutShrinkage factor applied
CNC / EDM MachiningCavity fabricationPrecision tooling
Initial TrialFirst test shotCheck dimension & appearance
Mold RevisionAdjust cavity if sample failsRepeat trials until approved
Mold lead time: 15–35 days, depending on shape complexity, tolerance and mold size.
03

Sampling & Customer Approval

Samples are made for your validation before mass production. Check the following items on each sample:

Verification Item
Dimensional tolerance
Hardness (Shore A)
Color matching
Surface condition: no flash, bubble, scratch
Assembly & sealing performance
Various custom molded rubber special shaped parts
Approved physical samples spanning various applications.
Sampling turnaround: 7–10 days (excluding shipping). After approval, mass production is released.
04

Mass Production & Quality Control

Once samples are signed off, we start volume molding with in-process quality control to guarantee batch-to-batch consistency.

In-process QC Check
Key dimension inspection
Shore hardness test
Visual check: no burr, crack, deformation
Aging / oil immersion / temperature test (on request)
In-house rubber testing laboratory for quality control
Our in-house QC laboratory ensures every batch meets rigorous physical standards.
Mass production lead time: 15–30 days, subject to order quantity and part complexity.
05

Export & Delivery

We manage export customs, booking and shipment from Qingdao, Shanghai and Ningbo, and provide the full trade documentation required for import clearance: Commercial invoice, Packing list, Certificate of origin.

We track your cargo and send regular updates until goods safely arrive at your destination port.

Ready to Start Your Custom Rubber Project?

Send your drawing, physical sample or application requirements. Our engineering team will deliver a formal quotation within 24 hours.

Request a Quote Now →

📩 Email: pengfei_liu@feizhipan.com | 🌐 Website: feizhipan.com

发表评论

您的邮箱地址不会被公开。 必填项已用 * 标注

滚动至顶部